UC Davis Medical Center 3.0T MRI Replacement

Client: UC Davis Medical Center

Size: 3,000 sq.ft.

Cost: $2,200,000

Completion: February 2020

Delivery Method: Design-Bid-Build

Location: Sacramento, CA

Service: Concept Design, Site Investigation, Agency Review and Approval, Architectural Design, Interior Design, Space Planning, Test Fits, Construction Documents, Pre-Bid Conference, Construction Administration, Design Intent Clarification (RFI), IOR Selection Assistance, Project Closeout, Record Drawings, Site Visits

Principal-in-Charge: John Flath

Senior Project Manager: DeAnn Splinter

Senior Project Architect: Shawn Lankford

Senior Design Technician II: Jinnelle Fong

Project Manager: Eric Tien

Structural Engineer: Buehler

Mechanical Engineer: Turley & Associates

Electrical Engineer: Edge Electrical Consulting

PROJECT DESCRIPTION

Designed to accommodate the installation of a new MRI, Nacht & Lewis began renovating the existing radiology department as part of the pavilion building. In addition, the project includes a renovation to the adjacent existing shell space to serve a new staff break room, relocated offices, ultrasound exam room with new patient toilets, clean utility and storage room.