PROJECT—Healthcare

Department of Veterans Affairs New Interventional Imaging Suite

Details

Client: Veterans Affairs (VA) Central California Health Care System

Size: 1,750 sq. ft.

Cost: $5,054,304

Completion: July 2024

Delivery Method: Design-Build

Location: Fresno, CA

Service: Architectural Design, Agency Review and Approval, Concept Design, Planning, Programming, Site Investigation, Interior Design, Space Panning, Construction Administration, Construction Documents, Specifications,

Team

Principal-in-Charge: John Flath

Project Manager: Eric Tien

Senior Design Technician: Jinnelle Fong

General Contractor: Colin Construction Company, Inc.

Structural Engineer: Buehler Engineering

Mechanical Engineer: R&A Solutions

Electrical Engineer: Sacramento Engineering Consultants

PROJECT DESCRIPTION

This project involved the renovation of an existing operating room on the third floor of the VA Fresno Medical Center to create an expanded, code-compliant Interventional Imaging Surgical Suite. Delivered via a design-build approach, the upgraded suite includes new control and equipment rooms to support advanced imaging and surgical procedures.

The scope of work featured the installation of an integrated ceiling system, ceiling-mounted equipment booms, medical gas services, and a dedicated cooling system for the equipment room. Structural steel enhancements were made to support the new ceiling-mounted systems. Additional infrastructure upgrades included improvements to ductwork, humidification systems, electrical service, and building controls. The team also upgraded power distribution and raceway systems to accommodate the installation and operation of advanced surgical equipment.

Construction activities were carefully planned and executed to minimize disruption to adjacent medical functions, ensuring that the surrounding healthcare environment remained fully operational throughout the project.