Client: UC Davis Health
Size: New CUP Annex: 31,954 sq. ft.
Existing CUP Renovation: 5,498 sq. ft.
Cost: $253,000,000
Completion: In Progress
Delivery Method: Design-Build
Location: Sacramento, CA
Service: Concept Design, Facility Assessment, Architectural Design, Interior Design, Space Planning, BIM Modeling, Certified Access Compliance Review
Principal-in-Charge: John Flath
Director of Design: Mike Parrott
Project Manager: Eric Tien
Senior Project Architect: Shawn Lankford
Senior Project Architect: Mike Smith
Project Architect: Chris Hirai
Senior Project Coordinator: Julie Bettencourt
Construction Manager: Cambridge CM
Contractor: Rudolph & Sletten
Structural Engineer: Buehler
Civil Engineer and Landscape Architect: Siegfried
Mechanical Contractor: Airco
Mechanical Engineer: Mazzetti
Electrical Contractor: Redwood Electrical Group
Electrical Engineer: Associated Engineering, Inc.
Geotechnical: Langan
Fire & Life Safety: GHD
Acoustical: AEC
The University of California Davis Health (UCDH) Central Utility Plant Expansion (CUPx) is driven by the campus utility load growth primarily from the new California Tower and 48X Complex. The California Tower will require utility support prior to its opening in 2030. In addition, the project establishes a road map to address the UC Policy on Sustainable Practices’ goals of net zero greenhouse gas (GHG) emissions by 2025, a path to reduce on-site natural gas and future growth through 2035.