Client: Elk Grove Unified School District
Size: 18,705 sq. ft.
Completion: August 2026
Delivery Method: Lease-Leaseback
Location: Elk Grove, CA
Service: Facility Assessment, Master Planning, Needs Assessment, Planning, Site Planning, Architectural Design, Interior Design, Construction Documents, Construction Administration
Principal-in-Charge: Brian Maytum
Senior Project Coordinator: Alex Balais
General Contractor: F&H Construction
Electrical Engineer: Edge Electrical Consulting
Civil Engineer: Warren Consulting Engineers
Mechanical Engineer: Weston & Associates Mechanical Engineers
Structural Engineer: Degenkolb
Low Voltage: KMM Services
Landscape Architecture: MTW Group
Replace aging campus buildings with new, flexible facilities that support contemporary learning environments, enhance student safety, and align with the vision established in Nacht & Lewis’ master plan.
Extensive demolition of cast-concrete buildings, undocumented utilities, and hazardous materials, while maintaining a safe and fully operational campus throughout construction.
Implement careful Phase 4 project phasing to maintain campus operations and student safety, while designing flexible, adaptable learning spaces and incorporating outdoor areas that extend learning beyond the classroom.