Client: Los Rios Community College District/Cosumnes River College
Size: 46,400 sq. ft.
Completion: August 2005
Delivery Method: Design-Bid-Build
Location: Cosumnes River College, Sacramento, CA
Principal-in-Charge: Brian Maytum
General Contractor: Otto Construction
Mechanical Engineer: Capital
Electrical Engineer: Koch, Chun, Knobloch
Civil Engineer: Mark Thomas & Associates
Structural Engineer: Buehler
Landscape Architect: Wild Landscape
Cost Estimating: Sierra West Group
Low Voltage/Fire Protection/Audiovisual: Angus-Hamer Networking
A two-story facility within an existing campus setting which responds to an established master plan and incorporates delicate pedestrian circulation patterns. The building incorporates extensive natural daylighting and responds to existing indigenous campus materials and its formal vocabulary with a contemporary interpretation. The facility also incorporates extensive data and other technology distribution for its array of computer laboratories and learning spaces.